Erection Bracing of Low-Rise Structural Steel Buildings

American Institute of Steel Construction
Engineering
Manual

How to Apply Erection Bracing of Low-Rise Structural Steel Buildings

Mastering the principles of erection bracing for low-rise structural steel buildings is a critical skill that directly impacts project safety, efficiency, and cost. This guide will equip you with the practical knowledge to effectively implement temporary bracing strategies, ensuring structural integrity during the crucial construction phase. By understanding and applying these concepts, you'll enhance your reputation as a reliable and competent engineer, contributing to successful project outcomes.

Before You Begin

Prerequisites:

  • Knowledge: Solid understanding of fundamental structural engineering principles, including load paths, stability concepts, and steel member behavior. Familiarity with general steel design codes (e.g., AISC Specification) and construction practices is essential.
  • Tools/Resources: Access to the "Erection Bracing of Low-Rise Structural Steel Buildings" manual by AISC, project design drawings, structural calculations, and relevant material property data.
  • Time Required: Approximately 4-6 hours for initial study and application to a typical low-rise project, depending on project complexity.

Step-by-Step Implementation

Step 1: Identify Critical Erection Phases and Loads

Begin by thoroughly reviewing the project erection sequence and identifying all phases where structural elements may be temporarily unstable or inadequately supported. Determine all potential construction phase loads, including gravity loads (self-weight of partially erected members), environmental loads (wind, seismic if applicable during construction), erection operation loads (impact, temporary equipment), and any imposed stability loads. Understanding these transient forces is paramount to preventing premature failure.

Step 2: Evaluate Permanent Structure's Capacity for Erection Loads

Assess whether the permanent structural members and connections are designed to resist the identified construction phase loads before the entire structure is complete. This includes evaluating columns, column bases (anchor rods, base plates, welds), and any intended permanent bracing or diaphragms. Common failure points at column bases, such as anchor rod fracture or pull-out and base plate bending, must be specifically investigated.

Step 3: Determine Need for Temporary Bracing

Based on the load assessment in Step 1 and the capacity evaluation in Step 2, determine where temporary bracing is required. If the permanent structure cannot safely support the construction loads during any erection phase, temporary supports are mandatory. This applies particularly to elements that are not yet integrated into a complete, stable system.

Step 4: Design Temporary Bracing Systems

Select and design appropriate temporary bracing systems. For low-rise buildings, this often involves wire rope diagonal bracing, temporary shoring, or temporary moment connections. Ensure that the design of these temporary systems accounts for the specific loads they will carry, including appropriate safety factors, and that their connections are robust and reliable.

Step 5: Verify Temporary Support Connections

Pay close attention to the design and installation of connections for temporary bracing. This includes wire rope connections to structural members (e.g., using projecting plates or bent attachment plates) and anchor rod connections to foundations. These connections must be designed to withstand the forces transferred from the bracing without failure.

Step 6: Consider Diaphragm Action During Erection

Evaluate the role of horizontal diaphragms (e.g., steel deck, concrete slabs) during the erection process. Determine if these diaphragms will provide sufficient lateral stability to the erected framework at various stages, or if additional temporary bracing is needed to ensure diaphragm integrity and load transfer during construction.

Step 7: Document Erection Bracing Procedures

Clearly document the required erection bracing, including locations, bracing member types, connection details, and erection sequence. This documentation should be communicated effectively to the steel erector and site supervision team to ensure proper implementation and verify that the temporary bracing remains in place until it is no longer required.

Common Pitfalls to Avoid

*

Copyright & official sources

This guide provides educational summaries and practical tips. For official standards or specifications referenced herein, we encourage you to purchase the original publications from their respective publishers. This supports continued development and ensures you have the complete, authoritative documentation.