Back to Practices
API API RECOMMENDED PRACTICE 5LW

Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels

API
Engineering
Recommended Practice
Classification

Topics & metadata

FolderCivil Engineering
Sub-domainPetroleum Engineering
TypeRecommended Practice
Year2009
StatusActive
LevelIntermediate
Summary

This document provides recommended practices for the transportation of line pipe on barges and marine vessels within the upstream segment of the petroleum industry.

Copyright & official sources

This page provides educational summaries and workflow checklists. For the official, legally binding document, we encourage you to purchase the current edition from the original publisher. This supports the organizations that develop and maintain these essential industry practices.

Understanding Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels

The safe and efficient transport of line pipe is a critical logistical challenge within the upstream petroleum industry. API Recommended Practice (RP) 5LW provides essential guidance for engineers and logistics professionals involved in moving line pipe via barges and marine vessels. This document aims to standardize practices, mitigate risks, and ensure the integrity of the pipe from fabrication yard to project site, a vital step in the complex pipeline construction lifecycle.

Purpose & Problem Solved

API RP 5LW addresses the inherent risks associated with transporting lengthy, heavy line pipe across waterways. Traditional, less structured approaches can lead to significant damage, including end impacts, surface abrasions, and fatigue cracks initiated by cyclic stresses during transit. These issues not only result in costly repairs or replacements but also compromise the structural integrity of the pipe, potentially leading to failures during operation. This recommended practice offers a framework to prevent such damage by detailing best practices for vessel preparation, pipe stowage, securing, and handling, thereby ensuring the pipe arrives at its destination in pristine condition and ready for installation.

When to Apply This Practice

  • Required Situations: This practice is mandatory when transporting API Specification 5L steel line pipe via barges or marine vessels on both inland and ocean waterways, as stipulated by contractual agreements or regulatory requirements.
  • Recommended Situations: It is highly recommended for any critical line pipe shipment where maintaining pipe integrity and minimizing transit-related damage is paramount, even if not explicitly mandated. This includes projects with tight schedules or where replacement pipe is difficult to procure.
  • Not Applicable When: This document is not directly applicable to the transportation of other materials or when line pipe is transported via land-based methods (rail, truck) where different handling and securing protocols are required.

Implementation Framework

Phase 1: Pre-Voyage Planning and Vessel Preparation

Thorough assessment of the chosen vessel's suitability, including its structural integrity and cargo-handling equipment, is essential. This phase involves verifying adequate shipping space, confirming the availability of appropriate handling gear, and planning the optimal stacking and securing arrangements for the specific pipe dimensions and quantities.

Phase 2: Secure Stowage and Securing

The core of the implementation lies in the meticulous stowage of the line pipe. This includes the proper use of bearing and separator strips to distribute loads and prevent direct contact, the implementation of effective side protection measures to avoid abrasion, and the robust securing of the entire cargo to prevent shifting, particularly against the dynamic forces encountered at sea.

Phase 3: In-Transit Monitoring and Inspection

During the voyage, regular inspections are crucial to identify any signs of movement, damage, or loosening of securing arrangements. This ongoing verification ensures that the pipe remains stable and protected throughout the transit period, allowing for timely corrective actions if issues arise.

Phase 4: Post-Voyage Verification and Documentation

Upon arrival, a comprehensive inspection of the discharged pipe is necessary to confirm its condition and the effectiveness of the transport measures. All relevant documentation, including loading plans, inspection reports, and any incident logs, should be meticulously maintained for record-keeping and future reference.

Quality Checkpoints

  • Before Starting: Verify vessel suitability, confirm availability and condition of all required securing materials (e.g., dunnage, chocks, straps), and review the approved stow