This document provides recommended practices for the truck transportation of line pipe within the upstream segment of the petroleum industry.

Copyright & official sources

This page provides educational summaries and workflow checklists. For the official, legally binding document, we encourage you to purchase the current edition from the original publisher. This supports the organizations that develop and maintain these essential industry practices.

Understanding Recommended Practice for Truck Transportation of Line Pipe

The safe and efficient transport of line pipe is a critical, yet often overlooked, component of upstream petroleum operations. API Recommended Practice 5LT (RP 5LT) provides a standardized framework to address the unique challenges associated with moving these vital components via truck. This document is essential for engineers, logistics professionals, and site managers involved in the procurement, delivery, and staging of line pipe, ensuring that materials arrive at their destination intact and ready for installation, thereby minimizing project delays and potential safety incidents.

Purpose & Problem Solved

This recommended practice addresses the inherent risks associated with transporting line pipe, such as damage from shifting loads, improper securing methods, and potential impact on public infrastructure. Traditional, less formalized approaches can lead to pipe deformation, coating damage, and safety hazards for transport crews and the public. RP 5LT offers a structured methodology that promotes secure loading, appropriate equipment selection, and adherence to best practices, ultimately enhancing the integrity of the transported pipe, improving logistical efficiency, and bolstering overall project safety.

When to Apply This Practice

  • Required Situations: This practice is mandatory for all truck transportation of new and used line pipe within the upstream segment of the petroleum industry, especially when specified in project contracts or regulatory frameworks.
  • Recommended Situations: It is highly recommended for any project involving the transport of coated or uncoated line pipe, regardless of size or weight, particularly when long distances or challenging routes are involved. It serves as a best practice for ensuring quality control during transit.
  • Not Applicable When: This practice is not intended for the transportation of pipe-forming equipment or other related materials not classified as line pipe. Alternative, specialized transport regulations may apply for exceptionally large diameter or heavy-wall pipe that exceeds typical parameters.

Implementation Framework

Phase 1: Planning and Preparation

Thorough route assessment, load calculation, and selection of appropriate trucking and trailer configurations are paramount. This includes verifying trailer roadworthiness, understanding weight limits, and planning for potential overhang and securing points.

Phase 2: Execution and Implementation

Careful loading procedures, including the correct use of bearing and separator strips, are critical. Proper banding and tie-down techniques, ensuring a secure and stable load that minimizes pipe-to-pipe and pipe-to-trailer contact, are essential for preventing damage.

Phase 3: Verification and Validation

Pre- and post-transport inspections of both the pipe and the securing mechanisms are vital. This includes confirming that no damage has occurred during transit and that all securing elements remain intact and properly tensioned.

Phase 4: Documentation and Closure

All transport-related activities, including inspection reports, load manifests, and any incidents, should be meticulously documented. This ensures accountability and provides a record for future reference and continuous improvement.

Quality Checkpoints

  • Before Starting: Verify that the chosen trailer meets specifications, that all securing equipment is in good condition, and that the loading plan accounts for pipe characteristics and route conditions.
  • During Execution: Continuously monitor the loading process, ensuring correct placement of bearing strips and proper tie-down tension. Conduct intermediate checks during transit if route or conditions warrant.
  • Upon Completion: Conduct a comprehensive inspection of the pipe and securing devices at the delivery point to confirm the integrity of the load and absence of any transport-